The floor will be glued directly to the sub flooring using a hardwood flooring adhesive.
Glue down hardwood floor on concrete.
The installation of hardwood floors by the glue down method is used predominately on concrete slabs.
My answer to that is yes and it is still warranted.
Glue adds extra security to ensure a solid installation.
The wall coverings and painting should be completed before the installation of the hardwood flooring.
Engineered wood is real wood.
Although it s not made of solid hardwood it doesn t mean that engineered flooring does not provide all of the warmth longevity and elegance of a hardwood floor.
But the catch is that the solid wood flooring we have that can be glued over concrete and warranted is 5 16 and 7 16 solid hardwood not 3 4 solid hardwood and can be only on on grade and suspended concrete.
Many products adhere to concrete and wood equally well but choosing the right glue for the application is important for lasting results.
With that said one of the most important factors while dealing with glue down installation is going to be your subfloor.
When working on a clean concrete subfloor the glue down method is often the go to choice.
Before you prepare the concrete for hardwood flooring it must be dry.
If installing glue down hardwood flooring in a new house completely close the building in with all outside doors and windows in place.
Applications are more prominent with residential construction in sunbelt areas commercial locations and high rise dwellings.
All wet work such as concrete masonry framing members drywall paint etc should be thoroughly dry.
Boards adhere well to the rough surface of the concrete subfloor and therefore lead to less gaps or planks lifting and buckling.
Sill plates furring strips and floor installations are among common applications for wood to concrete adhesion.
And for do it yourselfers the preferred method is the floating floor installation which.
Glue down hardwood floors on concrete.
Don t let the term engineered give you the wrong impression.
Some engineered wood flooring products are designed for a glue down application when installing flooring over a concrete slab.
Other products are better suited for a nail down installation where they are secured to a wood subfloor with nails or staples.
The glue down method of engineered wood flooring installation is typically the most common and creates a highly stable floor.
If the slab is new don t even begin moisture testing until 30 days after pouring it it probably won t be ready to be covered until 60 days after.
You usually determine this with a meter that compares the relative humidity of the slab with the ambient humidity.